Well, I am the man in charge for a couple of days while Chris B. is out of town. Just me and Ray from the Fairmont Park Commission are working our way through another set of terraces. Below is a step by step of the rock installation process. Measuring the grade and rise for each step, then creating the foundation with rocks ready to go, finally putting fill in over top of the rocks. Look at the size of the rock in this one. Tomorrow is more of the same and finishing a little rolling grade dip action. Just a few days left before I get to sleep in my own bed. I can't wait.
"A man who works with his hands is a laborer. A man who works with his hands and his brain is a craftsman. A man who works with his hands, brains, and heart is an artist." - Louis Nizer
Monday, September 29, 2008
Ben Blitch Bossman Builder..... Another B4
Well, I am the man in charge for a couple of days while Chris B. is out of town. Just me and Ray from the Fairmont Park Commission are working our way through another set of terraces. Below is a step by step of the rock installation process. Measuring the grade and rise for each step, then creating the foundation with rocks ready to go, finally putting fill in over top of the rocks. Look at the size of the rock in this one. Tomorrow is more of the same and finishing a little rolling grade dip action. Just a few days left before I get to sleep in my own bed. I can't wait.
Saturday, September 27, 2008
How THE Philly Rolls...
Okay, these people are awesome to work with. I really enjoyed working with them back in 2006 on Demo 1 and working with them now that they are organized and have some experienced is even better. Today we had a volunteer workday to take care of the last little section we have worked on all week. There was a bit of stone pitching.
Some folks built a really cool bench/rock ride
But, most importantly it seemed everyone had a good time.
Thursday, September 25, 2008
Moving Dirt is Moving Dirt....
What beautiful trail over the last two days. We have been working on a terraced section that is to accommodate a number of different uses and it has also been choking down the existing, Gravel, yeah gravel, road. Can you believe it?
Here are some photos of the work thus far. Hope you enjoy, the terraces are 9" tall with a 9% rise between them and a rolling dip in the middle, so it is like a 10% then a positive 2% to the next rock step. We have used a laser level and a plethora of other tools to achieve something I am personally and professionally very proud of.
Tuesday, September 23, 2008
A day at work...AH...
What a great day at work, I have really enjoyed working with my old boss Chris Burnhardt, I wish we would have had a chance to actually work together under IMBA it has been a pleasure to do it this week.
Here are a few photos for your enjoyment. We have been building terraces for the last couple of days and have been using a laser level"ish" thing to try and dial in the risers. It worked great today and hopefully we will continue to have luck with it tomorrow. Check out Chris lining things up for the next terrace. 8% with a 9" rise. the dot tells you where to dig, the machine arm is my view for eight hours of the day. And the guy sitting down, well that is Ray, he's a city worker, but this is the only time you could catch him sitting down all day. He is actually a real kick butt worker.
Tomorrow will be a walk through with local landscape companies, then a volunteer day, should have some good photos for you tomorrow, so check back.
Monday, September 22, 2008
Wissa Revisited...
Today was a reintroduction to the Wiss. I am going to be operating a mini-x for the next few weeks building terraces and doing some bench cuts too. This is a great experience as I get to work with my old BOSSMAN Chris. Here are a few photos shot with the new camera. Enjoy...I get to check out mentally a bit this week. YEAH!
Saturday, September 20, 2008
A two wheeled Evangelist
Chambersburg was quite the experience. A small town with great people, doing their best to do great things. I am very happy with the way the pump track turned out and certainly have a few lessons learned, but feel the technique and routine has tightened up significantly.
I am now in Philly working on the computer for the next two days. Monday will be a reintroduction to the project here at the Wiss. Then, it is two weeks of the craziness of the Sustainable Trails Initiative again.
Tomorrow, I will work on my presentation for the National Trails Symposium on the "Emerging Trend of Pocket Bike Parks".
Here are a few of the themes I am playing around with:
- Unstructured play
- civility
- Getting children outside
I will put a few more together and hopefully be able to eloquently explain myself to all of the trail "nuts" at the conference. This seems to be a chance to be a bit more of the evangelist.
Tuesday, September 16, 2008
Chambersburg...It is on...
I will be submitting all of my writing to the Chambersburg pumptrack blog for the next couple of days. Check it out and follow the Bike Reg. link if you want to make a donation.
For now it is twelve hour labors of love. Hope you enjoy.
Subscribe to:
Posts (Atom)